Walpole Middle School

Walpole, Massachusetts

Scheduled to open in Fall of 2024, this project consists of the new construction of a 162,000 SF new middle school in Walpole, MA with an expected enrollment of 1,000 students in grades 6 through 8. This new school will bring the students of both Bird and Johnston Middle Schools together into one building. The project is designed to be “Net Zero” ready and will be constructed on the grounds of the fully occupied Bird Middle School. The construction will be driven significantly by the logistics required to keep the existing Bird Middle School and adjacent athletic fields operating safely.

Client: 
Town of Walpole

Architect:
Tappe Architects

Project Type: 
New Construction

Market: 
K-12 School

Size: 
162,000 sq. ft.